Hit Signs

Guide

Your landlord's sign criteria shape your sign before your city reviews it.

Your lease's sign criteria can set your letter height, lighting, mounting and colors, so read them before anyone draws your sign.

Call Tom 727-370-5060
Sign bandYOUR NAMEWidthHeightYour storefront

Sign criteria are your landlord's private rules, separate from city code.

Sign criteria, also called a sign program or tenant sign exhibit, are your landlord's written rules for tenant signs. They are often attached to your lease: one published example is Exhibit F to a shopping center lease.

Landlords keep the right to revise their criteria, so ask your property manager for the current version and note its date.

Some cities add a public layer for multi-tenant properties. In St. Petersburg, properties developed under one plan file a uniform sign plan with their sign permits, and in a center with three or more tenant spaces your wall sign has to fit it (St. Petersburg's sign code). Tampa lets a shared sign plan rearrange signs across parcels, but it can't add to the total the standard rules allow, and it is recorded with the county (Tampa's sign code). Clearwater has its Comprehensive Sign Program. Ask for both: your landlord's criteria and any city-approved sign plan that covers your center.

Read your criteria, clause by clause

These clauses come from two published examples: a national shopping center landlord's tenant sign guide and one California center's sign program. Your own criteria control, and Florida centers' criteria vary.

Sign type
One national landlord asks for individual interior-lit letters and bans lit cabinets, box signs and exposed lighting. A lightbox you planned may be off the table, and your logo may need to be built as a shaped channel letter instead.
Letter height
The same guide sets 24-inch letters for spaces under 3,000 square feet and 24 to 36 inches above that, so your letter height may be fixed before reading distance or city limits come into it.
Width and placement
Your sign may be capped at 80 percent of your usable storefront width and centered on your sign band, so a long name may need a second line or smaller letters.
Construction
One guide specifies 5-inch returns on a 2 by 7 inch wireway and allows raceway mounting only in some markets, so your landlord may already have chosen your mounting method.
Lighting control
One guide asks for a photocell plus an outside on/off switch and does not allow a time clock alone.
Labels
Both examples ask for a UL rating where local authorities require one, and one allows no labels on the exposed face except those an ordinance requires.
Drawings
One guide wants scaled drawings with letter sizes, a section through the letter, colors, wattage, every wall penetration and a photo mockup, sent before anything is built.
Review period
One center gives itself 10 days to review your drawings, so build that time into your opening date.
Permit order
The same center bars any county permit application until your drawings carry its approval stamp.
Insurance
One center asks your sign contractor for insurance certificates that name your landlord.
Notice
One center asks for 48 hours' notice before your sign goes up.
Power
In one center's program, your landlord provides the main electrical service terminations, and the power and connections for your lit sign are your responsibility.
Upkeep and removal
Tenants keep their own signs repaired. One landlord can repair it at your cost plus a fee after 30 days' notice, and you and your contractor answer for installation damage.
Revisions
Your landlord may change the criteria, so keep the version you were given with your lease.
An installer in a boom lift basket works on tenant panels at the top of the Beach Plaza pylon
We applied tenant lettering to Beach Plaza's pylon panels from a boom lift. In a shared plaza sign, your criteria set what goes on your panel.
Taylor Sam's white channel letters and round logos on a dark fascia band above two wood-look canopies, by day
Taylor Sam's channel letters on the dark fascia band above its canopies at 312 3rd St S, St. Petersburg, are one of our jobs. Criteria call that strip a sign band.

Your landlord says yes. Your city still decides.

Your landlord's approval is private, and it does not replace your city's permit. Your sign has to meet both sets of rules.

In the published example, landlord approval comes first and the permit application second. Some cities ask for proof of the property owner's consent with your application: Clearwater asks for a notarized consent from the property owner when someone else signs, or a copy of your lease, and in St. Petersburg the property owner's written consent goes with a uniform sign plan when a tenant applies.

Your criteria may allow more than your city's code does, or less, and your sign has to fit within both. In St. Petersburg, for example, your wall signs can add up to 1.75 square feet for every foot of your storefront, capped at 48 or 150 square feet by zoning district, while your criteria may set a smaller limit. Sign codes change, so confirm the current rule for your property with your city, or ask Tom, before you order.

See our guides to sign permits in St. Petersburg and sign permits in Pinellas County.

When your brand standards and your criteria disagree

Franchise drawings set your colors and letter forms, and your landlord's criteria and local code may still change your sizes or lighting.

If your criteria ban box signs, your logo can be built as a shaped channel letter instead.

Paint matches your brand colors on returns readily. Faces are harder, and the lit color is the hardest to hold, so criteria that require lit letters make your night color a real decision.

Before you order anything that departs from your criteria, ask your property manager in writing, and keep the approval with your lease.

Criteria decide how many holes go in your landlord's wall.

Raceways and wireways put fewer holes in a wall than letters mounted one by one, and raceways need fewer than wireways.

On EIFS, fasteners reach the structure, with spacers so the foam is not crushed, and every hole is sealed.

When letters come down, unused holes are sealed: outdoor caulk for openings under 1/2 inch, and a metal patch with fasteners and caulk for larger ones.

Tenants and their contractors can be liable for installation damage, which is why criteria ask to see every penetration on your drawing. See raceway or direct mount.

Your lease decides who brings power to your sign.

The electrical code calls for a sign outlet at each tenant entrance of a commercial building, on a 20-amp circuit that serves nothing else.

In the published example, your landlord provides the service termination and you are responsible for your sign's connection.

In Florida, a sign specialty electrical contractor wires your sign up to its last disconnect, and work beyond that point is an electrical contractor's. See who connects power to your sign.

What to collect before you order

Gather these before anyone draws your sign, then send them to Tom Coletta, who owns Hit Signs, with your logo.

  • Your criteria, with the date of the version you have.
  • Any city-approved sign plan for your center.
  • Your sign band's height and width, and your storefront's frontage in feet.
  • Your landlord's submittal format, how many copies it wants and how long its review takes.
  • The insurance certificates your landlord asks of your sign contractor.
  • Where your landlord brings power for signs, and whether a sign circuit already exists at your entrance.
  • Your opening date.
  • Your logo as a vector file (AI, EPS, SVG or PDF) and your brand colors.
  • Any franchise brand drawings.

For the full list by sign type, see what to send Tom.

Short answers

In published landlord criteria, yes: in writing, before anything is built. Check your own lease for the exact wording.

Send Tom your sign criteria with your logo.

Attach your criteria, your logo file and a straight-on photo of your storefront, and tell us when you open.

Call Tom 727-370-5060