How we work
Here is how your sign goes from your first call to your building.
Start with a call to Tom Coletta or a photo of your building. We prepare your design for approval, build your sign and install it. Your project may also need decisions from your landlord, engineer, electrician or city.

Pick your job to see the steps that apply to it.
Step 1. You call or send a photo of your building.
Step 2. Your building is surveyed.
The survey records your wall's material and condition, what is behind it, and where your sign outlet and disconnect will go.
Step 3. Your city's and your landlord's rules are checked.
Your city's sign allowance and your landlord's sign criteria can cap your letter size and decide how your letters mount.
Step 4. Your sign is designed and drawn to scale.
A scaled drawing shows letter heights, overall length, colors, materials and where every hole goes.
Step 5. You get your price.
Step 6. You approve your proof before anything is made.
Step 7. Your landlord approves your drawing in writing.
Your landlord's approval does not replace your city permit.
Step 8. Your sign is engineered and permitted.
St. Petersburg asks for wall sign mounting details sealed by a state-certified design professional.
Step 9. Your letters are built.
Backs and faces are cut, returns are formed and fastened to the backs, and LED modules are wired to a power supply.
Step 10. Power reaches your sign, if it is lit.
Your building needs a sign outlet on a circuit that serves nothing else, and your sign needs a disconnect.
Step 11. Your letters go up.
Flush letters go up from a full-size paper pattern, and raceway letters mount as one unit with fewer holes.
Step 12. Your sign is inspected.
For a lit wall sign, Pinellas County's final asks for photos of the listing mark, disconnect and panel schedule.
Step 13. Your sign is on.
See which steps apply to your new letters, pylon, replacement faces or window graphics. We explain what we need from you, from the first photo through installation.
Every sign starts with your building and the rules that apply to it.
Step 1. You call or send a photo.
Call Tom at 727-370-5060 or send a photo of your building with our form. What to send Tom lists what helps.
Step 2. Your building is surveyed.
A site survey records your wall's material and condition, what is behind it, where your sign outlet and disconnect will go, the height and lift access, and your landlord's sign criteria. A freestanding sign adds your frontage, setbacks, power lines and underground utilities. For glass, it's each pane's size and type, since printed film changes how glass heats.
Step 3. Your city's and your landlord's rules come first.
Find out which office reviews your sign, because your mailing city is not always your permitting city. Then check your property's sign limits, whether an existing sign is grandfathered, whether your building is historic, and what your landlord's sign criteria require.
Then come your drawing, your price and your approvals.
Step 1. Your design and drawing.
One national landlord asks for a scaled drawing with letter heights, overall length, colors and materials, a section through the letter, wattage and where every hole goes. St. Petersburg wants an installation plan sealed by a state-certified design professional, with complete mounting details. A lit color is the hardest to match, so ask to see yours lit and unlit.
Step 2. Your price.
Your price depends on your sign's size, lighting, materials, mounting, engineering and permits. What channel letters cost explains each factor.
Step 3. You approve your proof.
You see and approve a proof of your sign before anything is made.
Step 4. Your landlord approves your drawing.
One published center's criteria call for written approval before your sign is built, a 10-day review, no permit application without the landlord's approval stamp, contractor insurance naming the landlord and 48 hours' notice before installation. Your landlord's approval doesn't replace the city permit. Landlord sign criteria explains more.
Step 5. Engineering and your permit.
St. Petersburg wants sealed drawings for wall and freestanding signs, a separate application for each freestanding sign and one for all of your building's wall signs, and gives you 10 business days to answer each round of comments. The City of Tampa asks for a wind loads report and foundation plans. On Pinellas County jobs of $5,000 or more, a Notice of Commencement is posted at the site. Sign permits in St. Petersburg and in Pinellas County walk through each process.
Next come fabrication, power, the footing and installation.
Step 1. Your sign is built.
Channel letter backs and faces are cut on CNC routers or laser cutters, returns are formed on a letter bender and fastened to the backs, the insides are painted to reflect light, LED modules are wired to a Class 2 power supply, drain holes go in at the low points, and the listed maker applies UL labels. Pylon columns and base plates are cut and welded, and an aluminum cabinet holds your faces. Window graphics are printed, laminated and cut.
Step 2. Power reaches your sign.
Your building needs a sign outlet at your entrance on a 20-amp circuit that serves nothing else, and your sign needs a disconnect. A Florida sign specialty electrical contractor can wire your sign up to that disconnect; the circuit beyond it is an electrician's. Who connects power to your sign explains more.
Step 3. Utilities are located and the footing is poured.
For a pylon or monument, Sunshine 811 must be notified at least 2 full business days before digging, and the ticket lasts 30 days. The footing is dug, rebar set with at least 3 inches of concrete cover, anchor bolts held level in a template, and the concrete kept moist while it cures. Pinellas County inspects the footing in person.
Step 4. Your sign goes up.
Flush letters go up from a full-size paper pattern taped to your wall, with studs set in adhesive and at least an eighth of an inch behind each letter. Raceway letters mount as one unit with fewer holes. Cabinets and columns go up by boom truck or crane, and face changes go from a bucket truck or boom lift on a calm day. Window film goes on dry, after any old film comes off.
Step 5. Your sign is inspected.
Pinellas County's final for a freestanding sign checks the posted permit, attachments, fastener sizes, face size, overall height and setbacks, plus a weld certificate if steel was welded on site. A lit sign adds photos of the listing mark, disconnect, breaker, panel schedule and how your sign is switched. The City of Tampa runs building and electrical finals.
Then your sign is on.
Your sign starts working for you the day it goes up, lit at night or carrying your colors on your glass. Signs in Florida weather explains how sun, salt air and storms wear on each part, and what you can check yourself.
Here is who handles each part of a sign, besides us.
Tom will tell you which of these steps we handle on your job.
| Task | You or your tenant | Your landlord | An engineer | An electrician | Your city or county |
|---|---|---|---|---|---|
| Find which office reviews your sign | Gives your street address | Answers questions about jurisdiction | |||
| Sign criteria and approval | Asks for approval | Approves your drawing in writing | |||
| Property owner's consent | Asks the property owner | Signs consent where the city requires it | Can require it with your application | ||
| Sealed drawings | Seals the structural drawings | Reviews them | |||
| Power to your sign | Provides power to your sign location | May provide the service connection under your lease | Runs the circuit to your sign's disconnect | Inspects it | |
| Permit fees | Pays them as your contract sets out, or pulls the permit as an owner-builder in limited cases | Takes out an electrical permit if it is separate | Issues your permit | ||
| Utility locate | Marks private lines, such as sprinklers | ||||
| Inspections | Gives site access | Provides a weld certificate if steel is welded on site | Meets the electrical inspection | Inspects your sign |
These things can add time, so plan for them.
- Your landlord's review. One published example allows 10 days.
- Your permit review. St. Petersburg gives you 10 business days to answer each round of comments.
- Historic review, if your building is a landmark or in a historic district.
- More comment rounds when an application is missing something.
- Wind, for face changes, which should wait for a calm day.
- Inspection scheduling.
One sign company puts permitting alone at anywhere from a few weeks to several months. Tell Tom your opening date when you first call.
Start with a photo of your building and your logo.
Send both to Tom, and we send your price and a proof to approve before anything is made.